Structural work – Pouring of concrete topping on precast concrete floor

Questions: 13

Most multi-storey steel framed buildings use precast concrete floors. Joints between concrete units are grouted with in-situ concrete and a concrete structural topping is applied.
This Form enables you to easily inspect if your precast concrete floor unit fits accordingly to the plan. Make sure your the details for your steel tubes, pipeworks, structural topping and reinforcements are in place as required for composite action with slim floor beams, enhanced diaphragm action in tall buildings, vibrational control of sensitive floors, durability in car parks and certain fire safety requirements.

Similar checklists you might be interested by

Safety

Workplace Safety Inspection

Safety inspection checklists are critical tools for the project manager…
Safety

Incident report

In the event of an accident on the construction site,…
Safety

Accidents at work and incidents reporting and survey form

This template creates a Form for reporting or surveying accidents…